After starting the work on this shower we
realized that the extent was much worse then what we could originally see.
There was standing water behind this tile that was taken out.
The wood was also rotted and needed to be replaced.
The green board was then replaced. The was no need to redo the shower
pan and the floor.
The
next step is to Tile and Grout the Shower.
Grouting was done the next day to let the thinset cure.
Then the shower was caulked and the door frame and fixtures put back on.