There was also efflorescence build up on the shower floor. (see above
pictures)
Below is where the old shower pan was taken out and a
new one replaced.
 
After the shower pan liner is put in then the sand mix is applied.
(see to the right below)

Cement
board and green board is put up. Then the tile laid on the shower
walls and floor.

Your
final installation is complete!! See below!!

MAKE SURE YOU HAVE A SHOWER PAN TEST IF YOU HAVE A LEAK.
YOU MAY NOT NEED TO REPLACE THE ENTIRE SHOWER PAN. IT MAY BE GROUT AND
TILE REPAIR. |